
A full interior remodel and re-image of a 3,200 sq ft fuel-station store, built in overnight phases while the store and pumps stayed open.
The challenge
The store had a dated layout with blocked sightlines from the register, failing VCT flooring, tired fluorescent lighting and a single restroom that didn't meet current ADA requirements. Closing for weeks wasn't an option.
Our solution
We redesigned the floor plan around a new checkout and an expanded beverage-cooler wall, then built it in five overnight phases. Crews installed commercial LVT zone by zone, retrofitted the store and canopy to LED, added dedicated cooler and food-service circuits, and rebuilt the restroom to ADA standards.
Before & after
BeforeAfterPhoto gallery
“We stayed open the entire remodel. They worked overnight in phases, and the store was ready for customers every morning.”
Keep exploring

Bathroom remodel · May 2026
A dated primary bath rebuilt with a curbless walk-in shower, a freestanding tub, a double vanity and heated porcelain floors.

Kitchen remodel · September 2026
A closed-off 1990s kitchen opened to the living room with an engineered beam, a 9-foot island, all-new lighting and waterproof flooring throughout.

Food-service build-out · March 2026
A grab-and-go coffee bar and fresh-food counter added to an existing convenience store, built overnight in three weeks.

Free consultation · No obligation
Tell us about your home or store. You'll get a clear, written estimate, usually within one business day.