
A dated primary bath rebuilt with a curbless walk-in shower, a freestanding tub, a double vanity and heated porcelain floors.
The challenge
A cramped 1980s bathroom with a pedestal sink, a leaking tub surround, poor ventilation and almost no storage.
Our solution
We reframed the wet wall, recessed the shower floor for a curbless entry with a linear drain and waterproofed the entire shower. A freestanding tub and double vanity went in, and new electrical added a heated floor, vanity lighting and a quiet humidity-sensing exhaust fan.
Before & after
BeforeAfterPhoto gallery
“The curbless shower is exactly what we wanted. They explained every option, and the final price matched the estimate.”
Keep exploring

Store remodel & re-image · July 2026
A full interior remodel and re-image of a 3,200 sq ft fuel-station store, built in overnight phases while the store and pumps stayed open.

Kitchen remodel · September 2026
A closed-off 1990s kitchen opened to the living room with an engineered beam, a 9-foot island, all-new lighting and waterproof flooring throughout.

Food-service build-out · March 2026
A grab-and-go coffee bar and fresh-food counter added to an existing convenience store, built overnight in three weeks.

Free consultation · No obligation
Tell us about your home or store. You'll get a clear, written estimate, usually within one business day.